Project Description
Client: Harmonix Construction
Location: Fleet
Scope of works
Automated Sliding Entrance Gates
To supply and install 1no. 2.4m High x 8.286m Wide Fully Automated cantilever sliding gate. The sliding gate will be constructed of an aluminium framing and clad with P868 mesh infill. The gate will operate via a Fieg control panel built into a locked cabinet within the hanging portal of the sliding gate. The gate will be finished to match surrounding fence. The gate will be designed and manufactured to be fully compliant to BS/EN 12453.
The gate system includes the following safety features to each leaf:
Dead Man Key Switch Operation
Emergency Stop Button
6 no. Live Monitored Safety Edges
Flashing Warning Light when in Operation
Dual Height Safety Photo Cells
Single Phase Input Power Supply
Construction of concrete pads to match the manufacturer’s specification, carried out at least 1 week prior to the installation of the gates. This is to ensure suitable curing time of the concrete prior to the installation of the necessary anchor studs to support the gate.
The access control for the gates will be via a 24hr timer that will be programmed by a Four Seasons Operative. Each unit will have a remote-control fob (option on extra fobs available) that will link into a radio transmitter set within the gate. Next to or on the main portal a keypad for operation of the gate out of hours.